Innovative Backyard ADUs + Garage Conversion ADUs + Multi-Family Conversion ADUs

Transforming Underutilized Real Estate into Custom Living Solutions

Our Backyard Homes + Garage Conversions are Highly Predictable + Customizable

Packed with Perks: An All Inclusive Solution

Quick Pre-fab + Fully Customizable

Silhouette of turn buckles

Low Fixed Cost

Silhouette of interlaced circles

Beautifully Designed

silhouette logo

Sustainable + Energy Efficient

Yin Yang symbol black and white design

Quality Materials + Finishes

Silhouette of turn buckles

Connects to Existing Utilites

Silhouette 1 2 3
Line drawing of a modern kitchen with cabinets, oven, stove, microwave, shelves, and utensils.

Are you a homeowner interested in a Symbihom living solution?

Take our quiz and learn just how easy it is to add more space!

Your Space Your Style, Let’s Get Started!

Getting More Living Space is Easy: Here’s How it Works

Person holding a sample architectural model of a modern house with a minimalist design.

01 Dream

It starts with your vision— are you looking for extra income, an accessible home for mom and dad, or maybe a guest house for family and friends? Dream deep as we help you define your goals and needs.

Architectural blueprints, paint swatches, black glasses, pen, and a cup of coffee on a white surface.

02 Design

With your vision as our guide, we customize a layout that works for your backyard, garage or home within the space you plan to repurpose.

A modern 500 sf backyard tiny house ADU with large windows, surrounded by a desert-inspired garden featuring cacti, succulents, and gravel pathways. The sky is bright and partly cloudy.

03 Prepare

We manage all the preparatory steps to planning your new living space so you don’t have to - everything from submitting permits for your new ADU to ordering materials, appliances, fixtures and finishes. Your new space will be ready for use in no time.

Person in work attire on ladder applying plaster to ceiling

04 Install

Our pre-fab modular system makes installation a breeze. Custom prefabricated wall panels are delivered to your property, assembled onsite, and connected to your existing utilities by our qualified installers.

A happy family of four entering a bright ADU, with two children running in front of their parents.
Butterfly with detailed wings illustration

05 Enjoy

Enjoy your new living space and start reaping the benefits!

From Blueprints to Brilliance: Hear Why Symbihom is a Game-Changer

Smiling homeowner of ADU with glasses in white shirt on neutral background

“Rebecca’s experience in construction and costing makes for a code-compliant unit with reliable subcontractors that she has vetted; she finishes the units beautifully, with light colors, up-lighting, and efficient usage of space; and she is an absolute joy to work with.” 

-Santa Clara Homeowner


Business Insider logo on a black background.

“Symbihom's process could be a game-changer for office-to-residential conversions that have proven to be difficult and costly. It could be easier for cities with desperate housing needs — like San Francisco — to add housing.”

Business Insider


Explore Our Sample Floor Plans

3D model of a single car garage conversion ADU house with visible kitchen and living area.

Garage Conversion

3D floor plan of a two car garage conversion ADU with kitchen, living area, and outdoor patio

Backyard Homes

3D rendered floor plan of a three car tandem ADU garage conversion featuring a living room, kitchen, dining area, bedroom, bathroom, and a patio with outdoor furniture.
3D rendering of an apartment floor plan layout with multiple rooms and communal areas, labeled with functions like "mechanical room, "refuse," and "housekeeping."

Home Conversion

Commercial Conversion

Experience the Benefits

New Living Space Means New Possibilities

  • Whether it's a private studio, family living area, or home office, Symbihom provides the freedom to design spaces that perfectly match your needs.

  • Smaller, efficient housing solutions require fewer materials and resources to build and maintain. This downsized living approach is not only affordable to build but also better for the environment.

  • Homeowners and commercial real estate developers can rent out their converted rooms, garages or backyard additions providing an excellent additional stream of income.

  • Each unit is thoughtfully designed with high quality, durable materials that stand the test of time. From sleek scratch-resistant countertops to elegant, easy-to-clean flooring, every detail is chosen for both style and longevity.

Modern ADU bedroom with cozy bed, multiple pillows, gray blanket, light wood flooring, white armchair, large windows, closet with paneled doors, indoor plants, and natural lighting.

Ready to Add More Living Space?